In October 2015, the construction of the 25,000-square-meter European double-beam assembly line workshop (513 project) in the North Plant area was fully launched.
+86-400-0373-818
Follow us
Phone
豫ICP备16003949号-1
Powered by www.300.cn
Copyright©Henan Mining Crane Co., Ltd.
Mobile
咨询热线 Phone
关注我们
Detail
October 2015
Release time:
2018/07/16
Page view
Previous article:
January 2016
September 2015
Next article: